Plans for New Old Homes
The Building
Process

The building process is the same no matter whether you invest in stock, modified, or custom plans...

Plan Review. Verify with your building official that your plan design criteria will work in your region. If it does not, then modifications will be required by a local designer, engineer, or architect. We always recommend that a design professional review plans for a specific site, and coordinate the structural, heating, cooling, and ventilation systems for the home.

Site Planning. Properly locating your new home on a building site usually requires the help of a seasoned professional. Prior to purchasing a home plan, a preliminary site plan should be created from a survey identifying property line dimensions, property easements, topography, and the location of all utilities. If the site is undeveloped land, then the well and onsite septic location must be identified on the plan.


Previous Page Plans & Services 1 2 3 4 5 6 7 Building Process 8 9 10 11 Next Page

 
©1998-2009 • THE BUNGALOW COMPANY • ALL RIGHTS RESERVED OUR POLICIES